4/8/2023 0 Comments Ever forward latinThe dredging is part of a salvage plan that has been approved by the US Coast Guard. The rescue team will carry out the plan utilising the most beneficial high tide period in the port area.” After sufficient mud is excavated the refloating operation will begin using both the tugboats and the power of her main engine. “The team is mobilising all available local tugboats to join in the refloating operation.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |